At Wuhu Apex, we serve over 200 B2B partners across 45 countries with fully customized vehicle power solutions. This article details our end-to-end OEM/ODM workflow so you know exactly what to expect.
Phase 1: Initial Consultation (Day 1–3)
Every project begins with a technical consultation. Our export engineering team will:
- Review your target market requirements and certification needs
- Discuss branding specifications (logo placement, color scheme, packaging design)
- Confirm product model selection and any hardware modification requests
- Provide a preliminary quotation based on your estimated annual volume
Phase 2: Design & Artwork (Day 4–10)
Once the scope is confirmed, our in-house design team prepares:
- Logo integration mockups — UV printing, silk-screen, or laser engraving options
- Packaging design — retail box, industrial carton, or custom gift box
- Firmware branding — custom boot screen, language packs, and charging profiles
- Label compliance — CE/FCC/UL marks, barcode placement, and regulatory text
Phase 3: Sample Production (Day 11–18)
After artwork approval, we produce golden samples:
- 2–5 fully branded units with final packaging
- Complete with all accessories and documentation
- Shipped via DHL/FedEx express for your inspection
- Sample cost is typically credited against the first bulk order
Phase 4: Quality Validation
Your team evaluates the samples against your specifications. Common checkpoints include:
- Physical dimensions and weight verification
- Logo print quality and color accuracy (Pantone matching)
- Functional testing (cranking performance, USB output, LED modes)
- Packaging drop test and presentation review
Phase 5: Mass Production (Day 25–45)
Upon sample approval, we schedule production:
- MOQ: Typically 500 units for standard models, 1000 for ODM projects
- Production capacity: 40,000+ units per month per model
- QC process: IQC → IPQC → OQC → FQC (four-stage inspection)
- Real-time updates: Weekly production photos and progress reports
Phase 6: Logistics & Delivery
We handle export logistics with experienced freight partners:
- FOB Wuhu / CIF destination pricing available
- Full container load (FCL) or less-than-container (LCL) options
- All export documentation: commercial invoice, packing list, certificate of origin, UN38.3 test report
- Door-to-door delivery coordination upon request
Timeline Summary
| Phase | Duration | Deliverable |
|---|---|---|
| Consultation | 1–3 days | Quotation & scope |
| Design | 4–10 days | Artwork proofs |
| Sampling | 11–18 days | Golden samples |
| Validation | 18–25 days | Approval |
| Production | 25–45 days | Finished goods |
| Shipping | 45–55 days | Delivered |
Ready to launch your own branded jump starter line? Submit an inquiry and our team will respond with a detailed project plan within 12 hours.

